Timber Gates
Built to suit timber paling, lap and cap, feature timber, hardwood or treated pine fencing — matched in look and built to last.
Request this gate
Gates
Owner-operated gate and fencing work across the Sunshine Coast, built by Oliver with practical advice, clean workmanship, and a clear free measure and quote process.
5-star Hipages rating
Rated highly by homeowners
Owner-operated
Oliver — direct from start to finish
Insured
Full business cover
10+ yrs experience
6 yrs as Ridgeback Fences
Why it matters
A gate needs to suit the fence line, access point, property layout, pets, height, privacy needs and daily use. Badly planned gates sag, bind, feel awkward, or look mismatched against the fence.
Ridgeback Fences builds gates as part of a proper fencing solution — same posts, same materials, same finish — not as an afterthought tacked on at the end.
What we build
Built to suit timber paling, lap and cap, feature timber, hardwood or treated pine fencing — matched in look and built to last.
Request this gateClean, durable gates colour-matched to Colorbond fencing for privacy, access and street appeal.
Request this gatePractical access for side paths, yards, pets, bins, storage areas and garden access.
Request this gateFor old, damaged, sagging or worn gates that need replacing — usually a same-day install once the gate is built.
Request this gateFor privacy, pets, pool surrounds, sloped blocks or property-specific access needs.
Request this gateFor homeowners wanting the fence and gate planned and built together from the start.
Request this gate
Built by Ridgeback FencesBuilt by the owner
Ridgeback Fences is owner-operated by Oliver, so customers deal directly with the person responsible for the quote, planning and workmanship. Gate work is measured around the real site conditions — access, slope, posts, fence height and how the gate will actually be used.
10 years of fencing experience, insured, based in Tewantin with a Sunshine Coast focus.
The process
The same steps every gate job — measured, agreed in writing, and built to the scope you signed off on.
01
Send through the job details — address, gate location, fence type, and any photos.
02
Oliver inspects the fence line, access, slope, posts and how the gate will actually be used day-to-day.
03
Material, height, swing direction, access and matching fence details locked in writing.
04
A 60% deposit secures your install window and covers materials and hardware being ordered in.
05
Posts plumb, gates square, hardware tightened properly — gate hung so it swings and latches the way it should.
06
The remaining 40% is paid once the gate is finished and you’re happy with the result.
Recent work
Real Ridgeback Fences jobs — no stock photos, no AI imagery.



Where we work
Priority work goes to suburbs within 20km of Tewantin and Noosa. Travel is included in every quote.
Speak directly with Oliver or request a free measure and quote for timber gates, Colorbond gates, side access gates, replacement gates and gate/fence packages.